Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
What are the best practices for Power BI deployment and collaboration?
#1
Power BI development and collaboration require a well-structured development process. Use version control for PBIX files and maintain documentation for models and reports. Collaborate through workspaces in the Power BI Service, ensuring proper permissions and access are granted based on user roles. Regularly publish reports and dashboards and set up scheduled refreshes. Testing reports in a staging environment before deploying them into production ensures fewer issues post-launch. Using deployment pipelines for migrating content between development, test, and production environments also promotes organized and controlled releases.

Forum Jump:

Users browsing this thread: 2 Guest(s)

Users browsed this thread: royben239